Powered by Max Banner Ads 
ATK and NASA’s Second Ground Test Will be Posted Online | the Leader

ATK and NASA’s Second Ground Test Will be Posted Online

Wednesday, September 1, 2010
By theleader

On Tuesday Aug. 31, as long as all goes well, ATK and NASA are set to test the second fully developed Ares five-segment solid rocket motor. The Leader will post a video of the ground test firing online along with a short article that day.

If you are interested in viewing the ground test live come to ATK in Promontory, the test will start at 9:27 a.m. This rocket motor is an upgraded version of the Shuttle’s 4-segment booster and a key element of NASA’s future Heavy Lift Launch vehicle.

Share

Tags: , ,

One Response to “ATK and NASA’s Second Ground Test Will be Posted Online”

  1. Kent Hyer

    T-0 is at 9:27a.m. It is suggested that you arrive at the viewing area 15 to 30 minutes before then. Viewing area is located westbound on Highway 83 about 2.5 miles after Highway 102 junction. Highway 102 is the Thatcher/Penrose highway.

    #14764

Leave a Reply

Special Issues


 Powered by Max Banner Ads 

Organ Donation

Car Care Guide 2014

2014 Spring Sports Preview



 Powered by Max Banner Ads 
Advertise here, call us at 435-257-5182.
 Powered by Max Banner Ads